Hefei Transformer District Energy Storage Demonstration Project


Project Period: August 2024

Location: Hefei, Anhui 


*AI-enhanced images 

System Configuration

  • ● Liquid-cooled energy storage integrated cabinet
  • ● Energy Management System (EMS): The liquid-cooled energy storage integrated cabinet has a built-in EMS; charge/discharge strategies are formulated based on real-time load conditions.

Parameters

Energy Storage Capacity 125 kW / 225 kWh

*AI-enhanced images

Challenges & Solutions

Technical Challenge Solution
High cost of grid upgrades in rural / remote areas A liquid-cooled energy storage integrated cabinet is connected to the low-voltage side of the transformer district. It charges during the day to absorb reverse PV power and discharges at night. Highly integrated one-piece delivery adapts to harsh environments.
Seasonal load fluctuations
Distributed PV consumption challenges
Reverse overload of the district transformer caused by reverse PV power feed
Light-load overvoltage, seasonal low voltage, and heavy overload in the distribution network

Application

  • Solar-Storage-Charging Integrated Microgrid

Project Highlights

  • High Integration: Integrated cabinet design enables convenient deployment and adapts to harsh rural environments.
  • PV Consumption: Effectively resolves the challenges of distributed PV reverse power feed and consumption.
  • Distribution Network Optimization: Peak shaving and valley filling alleviate heavy overload, low voltage, and other issues in transformer districts.
  • Replicable Model: Can be extended to low-voltage transformer districts, industrial parks, solar-storage-charging, and other scenarios.
WechatClose
Wechat
WhatsappClose
Whatsapp