Hunan Fishery-PV Complementary 100MW Photovoltaic Power Station Project


Project Time: Dec 2019

Location: Hunan (Aquaculture Water Surface) 


*AI-enhanced images
 

System Configuration

  • ● 1500V/3.125MW Central 35kV Oil-Immersed Transformer Box-Type Integrated Unit, Dual-MPPT Central Inverter

Parameters

PV Capacity 100 MW
Inverter Unit Capacity 3.125MW
MPPT Channels Dual MPPT
Grid Connection Voltage 35kV
Solution Type Oil-Immersed Transformer Box-Type Integrated Unit (Inverter + Transformer Integration)

*AI-enhanced images

Challenges & Solutions

Technical Challenge Solution
Water-surface PV projects feature flat module arrangement and uniform lighting, but special aquatic conditions must be considered Adopts 1500V system to reduce DC-side losses and cable costs
Module parallel mismatch issue (relatively rare in water projects, but still requires optimization) Adopts 3.125MW central inverter (dual MPPT), suited to flat water surfaces, uniform lighting, and low mismatch
Balance between investment cost and power generation revenue Adopts 35kV oil-immersed transformer box-type integrated unit, reducing equipment count and investment cost to ultimately achieve "maximum revenue, optimal investment cost"

Application

  • Fishery-PV Complementary ; Water-Surface PV Station ; Above-Water PV Generation + Underwater Aquaculture Integrated Utilization

Project Highlights

  • Efficient Water-Surface Utilization: Achieves "power generation above, fish farming below," boosting economic output per unit of water surface
  • Investment Cost Optimization: 1500V system + box-type integrated unit solution reduces equipment count and on-site construction volume
  • Maximized Power Revenue: Precisely selected central solution for water-surface scenarios, achieving optimal techno-economic performance
  • Large-Scale Validation: 32 inverters form a 100MW station, verifying the reliability of large-capacity central solutions